The floor system is 2 10 joists spaced 12 inches on center.
Cut floor for tub drain.
Hold the trap and pipe assembly in place and mark it for a cut.
However your shower s drain body may require you to drill a larger hole in the subfloor.
The second option is to buy a standard 60 wide shower pan with a center drain and cut a trench through the concrete slab from the tub drain to it.
Check the manufacturer s instructions for the diameter of the drain body and cut the hole to the appropriate size.
Wall access should be included for every bathtub.
Prior to drilling holes in these floor joists we installed 3 4 inch plywood to each one.
In a retrofit the subfloor may already be cut correctly.
Mark where the overflow at the top of the tub the drain and the connecting sanitary tee joint penetrate the subfloor.
Asymmetrical deck plate designed not to interfere.
This would allow for a near pipe sized diameter hole.
This means the hole you cut into the subfloor should be slightly larger than 2 inches in diameter.
Makes freestanding tub installation a breeze install the.
We cut out and doubled up a header where the tub p trap was to be installed.
Freestanding tub drain rough in kits.
Note the photos show a recent bathroom remodel where we relocated the tub drain across several floor joists.
Most shower drains utilize a 2 inch pipe.
Thank you all for your attention to this.
Dry fit and check that the horizontal pipe slopes correctly.
Reducing possible damage and making floor surface installation easier with no cut outs around the tub.
The position of the tub drain will vary depending on the size and design of the tub and you ll need to cut an access hole in the floor at the drain end of the tub to allow for positioning and.
An up flush drainage system features a pump that removes sewage from a holding tank located behind a toilet tub or shower and pumps it into the home s main drain which ties into the line leading to the city sewer main located at a higher elevation.
Believe it or not it s not that hard to cut a trench in concrete slab if you have the right tools.
To plumb the drain for the tub dry fit a 2 inch trap onto a length of 2 inch pipe that is longer than it needs to be.
The tub manufacturer should most do offer the same tub model with legs that elevate the base of the tub enough to accommodate the drain above the sub floor.
The system also contains a grinder that liquefies solid waste for easy removal.
That s what should be used in this situation.
I really appreciate the advice.
Works with all freestanding tubs.